Toyota — Initial 90 Day/250 Deadman Hours (HD) Maintenance

Toyota Pallet Truck Service Manual Planned Maintenance Initial 90 Day/250 Deadman Hours (HD) Maintenance Initial 90 Day/250 Deadman Hours (HD) Maintenance 00700-CL398-07, Issued: 9 August 2007 4-3 Perform the following maintenance tasks 90 days after the truck was put into service or at 250 HD, whichever comes first. Component Task Drive Unit Break mounting bolts free and reapply thread-locking compound . Re-torque mounting cap screws to 30 ft. lb. (41 N•m). See “Drive Unit” on page 6-51. Change fluid. See “Hydraulic Fluid” on page 6-76. Hydraulic Reservoir Change hydraulic fluid. See “Hydraulic Fluid” on page 6-76. Power Amplifiers Torque power cable terminal nuts to 100 in. lb. (11.3 N•m).