50 Power Train 30-6 Continuous-Running PTO Shafts Model 2120 Tractor TM-4252 (Dec-70) DUAL REAR 540 RPM AND 1000 RPM PTO SHAFT 50313A Fig. 6 Dual Rear 540 rpm and 1000 rpm PTO Shaft, Shown with Mid 1000 rpm PTO Shaft 1 Stub shaft for 1000 rpm 2 Stub shaft for 540 rpm 3 Quill 4 Oil seal 5 PTO pilot 6 PTO shaft 7 Shifter collar 8 PTO driven shaft 9 540 rpm gear 10 1000 rpm gear NOTE: This PTO shaft can be combined with a mid 1000 rpm PTO shaft (see fig. 6). Remove oil seal 3 (fig. 7) from bore of trans¬ mission case. For details on mid PTO shaft see page 4. CAUTION: Take care not to damage bore when removing oil seal. When assembling, install new oil seal.
For rear PTO shifter mechanism see "Single rear 540 rpm PTO shaft" (page 1). REMOVAL Before starting work on the PTO shaft, drain trans¬ mission case. REMOVING PTO SHAFT Operate rear PTO shifter mechanism to disengage PTO shaft. This will prevent the collar of the shifter mechanism from dropping into transmission case when removing PTO shaft. Remove cap screws attaching rear quill to transmis¬ sion case. Pull quill out of transmission case. Fig. 7 Removing PTO Shaft Pilot 1 PTO shaft pilot 4 Snap ring 2 Ball bearing 5 Special washer 3 Oil seal Printed in Germany