Komatsu — OPERATIONS AND CHECKS AFTER STARTING ENGINE

OPERATION OPERATION 1. Pull fuel control lever (1) to the center position between LOW IDLING and HIGH IDLING and run the engine at medium speed for about 5 minutes with no load. 2. After warm-up has completed, check gauges and caution lamps for proper operation. If any abnormality is found, repair it. Continue to run the engine at low load until engine water temperature gauge ( 2 ) falls within the white range (Mon- itor Panel Spec.) or green range (Gauge Panel Spec.). 3. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 3-68