hyundai R510LC-7 — 3. PILOT CIRCUIT

3. MAIN RELIEF PRESSURE CHANGE CIRCUIT 45073HC04 When the power max switch on the left control lever is pushed ON, the power max solenoid valve is actuated, the discharged oil from the pilot pump into Py2 port of the main relief valve of main control valve ; Then the setting pressure of the main control valve is raises from 330 kgf/cm 2 to 360 kgf/cm 2 for increasing the digging power. And even when press continuously, it is canceled after 8 seconds. 3-8