2) TEST PROCEDURE SPEC : 200~450 mA (1) Test 4 : Check electric current at EPPR valve at H-mode Install multimeter as figure. Start engine. Set the accel dial at "10"(max) Set H-mode with 1700 CN-75 Multimeter 50 rpm . Check electric current. EPPR valve 2507A5MS08 (2) Test 5 : Check pressure at EPPR valve at H-mode Connect pressure gauge at EPPR valve. Start engine. Set the accel dial at "10"(max) Set H-mode with 1700 SPEC : 5~20 kgf/cm 2 (70~280 psi ) Pressure adjusting screw locknut CN-75 Supply line, pilot pressure 50 rpm . Operate bucket lever completely push or pull. Hold arm lever at the end of stroke. Check pressure at relief position. EPPR valve 2507A5MS09 6-43