2. CARRIER ROLLER Frame 1) REMOVAL Loosen tension of the track link. (1) Grease valve 8-162(1) 210-7 Jack up the track link height enough to permit carrier roller removal. (2) Jack Carrier roller 8-162(2) 210-7 (3) Loosen the lock nut (1). (4) Open bracket(2) with a screwdriver, push out from inside, and remove carrier roller assembly. Weight : 80 kg (180 lb ) 2) INSTALL (1) Carry out installation in the reverse order to removal. 8-166 Carrier 1 roller 2 8-162(3) 210-7