hyundai R510LC-7 — 2. MAIN CONTROL VALVE

(2) Boom up (flow summation) When the boom 1 spool is pushed to the left by the pilot pressure of port Pa7, the neutral passage(R1) is closed, the oil discharged from pump P2 flows into the port A7 via parallel passage(R3), the load check valve(S7-1). At the same time, the boom 2 spool is pushed to the left by the pilot pressure of port Pa3, the neutral passage(L1) is closed, the oil discharged from pump P1 flows into the port A7 via parallel passage(L3), the load check valve(S3-1) and then joins to the passage( ). The return oil from port B7 flows into the tank via the tank passage(Ta). 45071MC07 2-31