JCB — Inspecting the Top Wear Pads

www.WorkshopManuals.co.uk Extending Dipper - Wear Pad Adjustment The Extradig dipper wear pads are bolt-on replaceable items. They support and guide the inner dipper section during extension and retraction. The following procedures explain how to inspect, and where applicable, adjust the pads. Inspecting the Top Wear Pads 1 Park the machine on level ground. Engage the parking brake and put the transmission in neutral. There is a front and rear set of pads, each set comprises top wear pads A and bottom wear pads B . 2 Position the boom and dipper as shown at C . Retract the Extradig dipper D . Make sure that the bucket is clear of the ground and the dipper is supported.

The top wear pads A are not adjustable and must be replaced with new pads once they have worn to their limit. See Inspecting the Top Wear Pads . 3 Stop the engine and remove the starter key. Renew the pads when, or before they are worn down to the depth of the recess/chamfer as shown at E . If the pads are worn near to their limit then inspect them more frequently than recommended in the Service Schedules. To avoid damage to the dipper or wear pad make sure the pads are fitted the correct way round as shown at J . The bottom wear pads B are adjustable and take up the wear on both the top and bottom pads. They must also be replaced with new pads once they have worn to their limit.

See Adjusting the Bottom Wear Pads . New wear pads A and B must be replaced as a set and fitted by a qualified service engineer. Torque Settings Item Nm kgf m lbf ft F 56 5.7 4 F A A E B B D J C S312991 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section B Body and Framework Section B 25 - 1 25 - 1 Service Procedures