JCB — Dismantling and Assembly

www.WorkshopManuals.co.uk Servo Pressure Supply Valve Dismantling and Assembly Dismantling The illustration shown on the opposite page is intended as a guide to dismantling. Be sure to note the location of all components when dismantling. Although some components may appear to be identical they are not interchangeable. Make sure that components are assembled in their original positions. Accumulator The accumulator 1 can be removed as shown. Take great care when handling the accumulator, the unit is pre-charged with nitrogen gas and further dismantling of the accumulator should not be attempted. The adaptor assembly 3 incorporates a non-return valve with a spring and ball as shown.

Great care should be taken when dismantling and assembling a valve to avoid the following:- Regulating Valve Assembly The regulating valve assembly 5 can be removed as shown. The valve is non-adjustable and is factory set with shims. Take care to keep all the shims together. Contamination Damage to spools Damage to seal grooves Any of the above may result in possible problems with the operation of the valve. Pressure Relief Valve The pressure relief valve 6 can be removed as shown. Solenoid Isolation Valves The solenoid isolation valves 7 can be removed as shown. It is possible to remove the valve cartridges for cleaning or resealing without removing the complete valve from the machine.

If there is evidence of damage to the valve or its seat caused by debris then the cartridge must be renewed. 1 Remove the servo pressure supply valve from the machine, refer to Servo Pressure Supply Valve - Removal and Replacement . Note: The illustration depicts a complete strip down, but to carry out specific servicing/repairs, e.g. renewal of one of the solenoids, it is only necessary to dismantle the relevant components. Note: If removing components from a valve block that is fitted on a machine the pilot circuit accumulator pressure must be vented first.

With the operator seat locked in the rear facing position and with the arm rests raised forward (for backhoe operation), switch the starter to ON without starting the engine. Operate the joystick controls several times to vent the hydraulic pressure from the servo system and backhoe rams. Turn the starter switch to the OFF position and remove the key. Assembly Assembly is the reverse of the dismantling sequence. 1 Clean the valve components in an appropriate solvent. 2 Renew all 'O' rings and back-up rings. 3 Lubricate parts with JCB Hydraulic Fluid before assembling. Make sure that all the parts move freely.

Torque Settings Item Nm kgf m lbf ft 1 100 10.2 73.8 2 10 1 7.4 2A 10 1 7.4 2B 30 3 22.1 3 100 10.2 73.8 4 100 10.2 73.8 5 150 15.3 110.6 6 100 10.2 73.8 7 15-20 1.5-2 11-14.8 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section D Controls Section D 51 - 3 51 - 3 Precision Control (Servo)