JCB — Section E: Hydraulics

www.WorkshopManuals.co.uk Contents Page No.

Excavator Valve - Precision Control (Servo) - Machines from January 2003 Pressure Testing - Load Sense Relief Valve 23 - 11 Pressure Compensator Network - Testing 23 - 12 Ram Creep Tests - All Services 24 - 1 Quick Release Couplings Connecting & Disconnecting 25 - 1 Smooth Ride System Charging/Discharging the Accumulator 26 - 1 Hose Burst Protection Valves (if fitted) Checking 27 - 1 Lowering a Load - In a Failure Condition 27 - 1 Pressure Testing - Loader Lift Ram 27 - 2 Main Pump Fixed Flow Removal and Replacement 30 - 1 Dismantling and Assembly 31 - 1 Variable Flow Dismantling and Assembly 35 - 1 Loader Valve - Fixed Flow Removal and Replacement Manual Control 50 - 1 Dismantling and Assembly Main Relief Valve (MRV) 50 - 6 Auxiliary Relief Valves (ARV’s) 50 - 8 Unloader Valve 50 - 10 Standard Spool - Manual 50 - 12 Float Spool - Manual 50 - 14 Electric Detent Spool - Manual 50 - 16 Bolt on Auxiliary Spool Section 50 - 24 - Auxiliary Relief Valves 50 - 26 Precision Control (Servo) - Machines from January 2003 51 - 1 Standard Spool 51 - 3 Electric Detent Spool 51 - 5 Mechanical Detent Spool 51 - 7 Loader Valve - Variable Flow Removal and Replacement 55 - 1 Dismantling and Assembly Priority Inlet Section 55 - 2 Auxiliary Spool 55 - 4 Loader Shovel Spool 55 - 6 Loader Lift Spool 55 - 8 Fitting Spool Seal 55 - 10 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 4* Section E Hydraulics Section E iii iii