JCB — Loader Operation

www.WorkshopManuals.co.uk 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 11 - 5 11 - 5 Circuit Descriptions Hose Burst Protection Valve Loader Operation The small letter annotations V2, C2, P, T and E are the same as the port markings found on the HBPV. Operation 1 - Load Raise When lift is selected, oil from the loader valve block 9 is fed to port V2 on the HBPV, the oil opens check valve sleeve A against spring B and passes through internal galleries into the (raise) side of the ram via port C2. Oil from the lower side of the ram returns to tank via port P and the loader valve block.

Operation 2 - Load Lower Oil from the loader valve block 9 is fed directly to the (lower) side of the ram. A pilot line C from the service line is connected to the HBPV at port P. Oil enters the HBPV at port P and passes through drilling D, down threads F and acts on the end face of piston G. The pressure is sufficient to move piston G to the right, thus moving plunger J off its seat against spring H. With the plunger off its seat, oil from the opposite side of the ram enters the HBPV at port C2, passes through the HBPV and returns to tank via port V2 and the valve block.

A drilled hole N through the centre of plunger J connects chamber Q to atmosphere T, this prevents the pressure in chamber Q from rising to such a point that it would prevent any movement of plunger J. Threads F and the one-way check valve ball L act as restrictors to 'dampen' any adverse effects of operating the Component Key: A Check Valve Sleeve B Spring C Pilot Line D Drilling F Thread G Piston H Spring J Plunger L Ball N Orifice Q Chamber 9 Loader Valve Block control levers erratically. control levers erratically.