www.WorkshopManuals.co.uk Auxiliary Relief Valves - Using Hand Pump 4 Install the A.R.V. sub-assembly into setting body 2 . Make sure that the adjusting pin 3 correctly locates in adjusting screw 9 . Make sure that the lock nut 10 correctly locates in the setting body socket - the anti-cavitation cone should still be closed, as shown at B . 5 Install the A.R.V. sub-assembly and setting body into test block 1 . Make sure that the assembly is installed in the port marked ' RV ' (relief valve). 1 S162570E 6 Connect a hydraulic hand pump to port ' P ' (pump) of the test block 1 . Make sure that the hand pump is filled with JCB Hydraulic fluid.
S162570F Connect a 0 to 400 bar (0 to 6000 lbf/in 2 ) pressure test gauge to port 'G' (gauge) of the test block 1 . 1 Port ' T ' (tank) can be left open when using a hydraulic hand pump. 7 Raise the pressure at the valve inlet using the hydraulic hand pump, when the A.R.V. 'cracks' and oil escapes from the port marked ' T ' the pressure gauge will indicate the A.R.V. setting. S162570F If the A.R.V. setting is correct, move to step 12. If the A.R.V. setting is not correct, move to step 8. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 23 - 6 23 - 6 Service Procedures 3 0 9 2 B S162570D