JCB — Main Relief Valve

www.WorkshopManuals.co.uk Dismantling and Assembly Main Relief Valve (MRV) The numerical sequence shown on the illustration is intended as a guide to dismantling. Assembly Renew all 'O' rings and back-up rings. For assembly the sequence should be reversed. Lubricate parts with JCB Hydraulic Fluid before assembling. Make sure that all the parts move freely. The following points MUST be avoided when dismantling and assembling the valve: Make sure that the 'O' rings and back-up rings are fitted the correct way, items 10 and 11 . CONTAMINATION DAMAGE TO SPOOL DAMAGE TO SEAL GROOVES Adjust pressure setting as required, refer to Service Procedures, Loader Valve - Pressure Testing .

All or any of the above points may result in possible problems with the valve. Dismantling Torque Settings When removing 'O' rings and seals, use an appropriately rounded tool that WILL NOT cause any damage to the seal grooves. Item Nm kgf m lbf ft 3 5.4 0.6 4 Discard ALL 'O' rings and back up rings. DO NOT use worn or damaged items. Inspect the valve components for scratches, nicks or any other type of damage, replace with new if required. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 50 - 7 50 - 7 50 - 7 Loader Valve - Fixed Flow 50 - 7