www.WorkshopManuals.co.uk Dismantling and Assembly Auxiliary Spool Assembly Renew all 'O' rings and back-up rings. The numerical sequence shown on the illustration is intended as a guide to dismantling. When fitting bolt 14 , clean the threads then apply a small quantity of JCB Threadlocker & Sealer to the threads of the spool. For assembly the sequence should be reversed. The following points MUST be avoided when dismantling and assembling the valve: When fitting spool seals 19 and 20 refer to the procedure Fitting Spool Seal . CONTAMINATION DAMAGE TO SPOOL DAMAGE TO SEAL GROOVES ALWAYS fit three shim (item 5 ) in between each valve block section as shown.
All or any of the above points may result in possible problems with the valve. Run the engine and inspect the valve for external leaks. Torque Settings Dismantling Item Nm kgf m lbf ft 1 41 4.1 30 6 6 0.55 4 10 8 0.8 6 14 8 0.8 6 21 67 6.9 50 25 13.5 1.38 10 26 13.5 1.38 10 Remove tie rod nuts 1 and end cover 2 . Separate the valve sections 3 take care not to lose shims 5 . Remove and discard ‘O’ rings 4 . When removing 'O' rings and seals, use an appropriately rounded tool that WILL NOT cause any damage to the spool or seal grooves. Care must be taken to ensure that the spool 13 is not damaged when removing it from the valve block.
Item Description 1 Tie rod nuts 2 End cover 3 Valve section 4 O-ring 5 Shim 6 Bolt 7 Dust boot 8 Dust guard 9 Seal 10 Bolt 11 Washer 12 Centering spring housing 13 Spool assembly 14 Bolt 15 Spring cup 16 Spacer 17 Spring 18 Spring cup 19 O-ring 20 O-ring 21 Plug 22 O-ring 23 Spring 24 Poppet 25 Primary shuttle housing 26 Shuttle plug assembly 27 Ball bearing Hold the spool in a suitable clamp, unscrew bolt 14 and remove spring 17 , spacer 16 and cups 15 and 18 . 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 55 - 5 55 - 5 Loader Valve - Variable Flow