JCB — Auxiliary Relief Valves

www.WorkshopManuals.co.uk Dismantling and Assembly Auxiliary Relief Valves Eight A.R.V's are fitted at positions 4H to 4Q. These are identical in design but have various pressure settings, refer to Technical Data . A.R.V. Position Key Control Layout JCB ISO Case Ford Note: Valve 4Q is only fitted to machines equipped with a Powerbreaker. Slew Right 4H 4H 4H 4H Slew Left 4J 4J 4J 4J The numerical sequence shown on the illustration is intended as a guide to dismantling. Boom Rod 4K 4M 4M 4K Boom Head 4L 4N 4N 4L For assembly the sequence should be reversed.

Dipper Rod 4N 4L 4K 4N Dipper Head 4M 4K 4L 4M Dismantling Bucket Rod 4Q 4Q 4Q 4P Dismantle sub-assembly 14 from item 1 using a special tool (see Service Tools ). The special spanner locates in cross holes B . Bucket Head 4P 4P 4P 4Q Note: The bucket rod side A.R.V. is only fitted to machines equipped with a Powerbreaker. Dismantle sub-assembly 14 into its component parts. Make sure that small drilling A is not blocked. Discard old and worn O-rings and back-up rings. Assembly Renew all O-rings and back-up rings. Lubricate O-rings and back-up rings with JCB Hydraulic Fluid. Fit back-up ring 13 on the upper side of 'O' ring 12 as shown in the inset.

Fit flat face of sleeve 9 against shoulder of poppet 10. Torque tighten item 14 using the special tool (see Service Tools ), until its shoulder seats firmly against item 1 . Pressure test the relief valves, refer to Service Procedures, Excavator Valve - Pressure Testing . Torque Settings Item Nm kgf m lbf ft 1 65 6.6 48 3 24 2.5 18 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 2* Section E Hydraulics Section E 61 - 4 61 - 4 Excavator Valve