www.WorkshopManuals.co.uk Dismantling and Assembly Precision Control (Servo) (Machines from January 2003) Dismantling The excavator valve block is a ‘sandwich type’, which is made up of a number of separate sections. The illustration shown on the opposite page is intended as a guide to dismantling. Be sure to note the location of all components when dismantling. Although some components may appear to be identical they are not interchangeable. Make sure that components are assembled in their original positions. Service Spools Each of the service spools 6 can be removed as shown. Care must be taken to ensure that the spool is not damaged when removing it from the block.
Note that all spools are similar in appearance but must not be interchanged as they are matched to their bores. All spools have the same centring and sealing components. 1 Remove the excavator valve block from the machine. Flow Regulator Valve The dismantling and assembly procedures for the flow regulator valve 7 are detailed separately, refer to Flow Regulator Valve . 2 Remove the three tie rod nuts 1 . 3 Carefully separate and remove the outlet section 2 followed by the remaining service sections 3 . If the inlet section 4 is to be replaced, remove and retain the tie rods 5 .
Load Sense Relief Valve The dismantling and assembly procedures for the load sense relief valve 8 are detailed separately, refer to Load Sense Relief Valve . Assembly Assembly is the reverse of the dismantling sequence. Flushing Valve The flushing valve 9 can be removed as shown. Auxiliary Relief Valves The A.R.V's 10 appear identical but have various pressure settings, refer to Technical Data . Ensure that they are correctly adjusted and fitted in their specified positions. The dismantling and assembly procedures for the ARV’s are detailed separately, refer to Auxiliary Relief Valves (ARV’s) . 1 Clean the valve components in an appropriate solvent.
Ensure that the mating faces of the valve sections are thoroughly clean before assembly. 2 Renew the ‘O’ rings located between the valve sections. Make sure the ‘O’ ring seals are not trapped or damaged. Anti-cavitation Valve The dismantling and assembly procedures for the anticavitation valve 11 are detailed separately, refer to Anti- cavitation Valve . 3 Lubricate parts with JCB Hydraulic Fluid before assembling. Make sure that all the parts move freely. Torque Settings Pressure Compensator Valves Each of the pressure compensator valves 12 can be removed as shown. Note that all valves are identical in appearance. Note that components are not interchangeable.
Item Nm kgf m lbf ft 1 35 3.6 25.8 6A 10 1 7.4 7 20 2 14.8 8 45 4.6 33.2 9 100 10.2 73.8 10 70 7.1 51.6 11 70 7.1 51.6 11A 70 7.1 51.6 12 60 6.1 44.3 13 30 3 22.1 14 20 2 14.8 14A 45 4.6 33.2 Load Hold Check Valves Each of the load hold check valves 13 can be removed as shown. Note that all valves are identical in appearance. Ensure good condition of seating faces on poppets and on the mating faces in the valve block. Hydra-clamp Solenoid Valve The hydra-clamp solenoid valve 14 can be removed as shown. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 62 - 21 62 - 21 Excavator Valve