JCB — Loader Lift Ram

www.WorkshopManuals.co.uk 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 70 - 2 70 - 2 Hose Burst Protection Valves Dismantling and Assembly - Loader Lift Ram This procedure applies to Hose Burst Protection Valves fitted to the loader arm rams ONLY. The numerical sequence shown on the illustration is intended as a guide to dismantling. For assembly the sequence should be reversed. Dismantling If possible, avoid disturbing pressure settings, remove cartridges by unscrewing hexagons 1 and 13 and do not remove capnuts 3 and 16. Spool 2 and check valve 11 each have a Teflon ring fitted (items A and B respectively).

These Teflon rings should only be removed and replaced with new ones if they are damaged. Do not try to dismantle items 20, 21 and 22 (these items are shown for pictorial reference only). To clean, use a non- metallic probe to move the ball 21 against spring 22 whilst assembly 17 is submersed in cleaning fluid. Check condition of all visible seating faces. If any are damaged, renew complete cartridge or valve assembly. Check valve bores and spools for nicks, scratches or scoring, if necessary, renew complete cartridge or valve assembly. Assembly DO NOT apply JCB Threadlocker and Sealer or any other type of locking fluid to the threads of item 17.

The threads form an integral part of the valve operating sequences - applying locking fluid to the threads will seriously effect the operation of the valve. Ensure that the small drilled holes C and D in items 2 and 17 respectively are not blocked. Renew all seals. If fitting new Teflon rings A & B, use a conical guide, such as item E, to expand the rings gradually. Complete the ring fitting procedure as quickly as possible, otherwise the ring will stretch. See below. Note: There is an O-ring F fitted underneath each Teflon ring, if the Teflon rings are to be renewed, make sure that new O-rings are fitted first.

After assembly, make sure that the valve parts move freely, if they don't, check that all the seals are correctly fitted. After refitting the valve to the machine, ensure that pressure settings are correct, see Technical Data page, and check that the valve operates correctly. If the pressure settings were disturbed, then the valve must be re-set, refer to Service Procedures, Hose Burst Protection Valves, Pressure Testing - Loader Lift Ram. E B F 325780 11 A183490 325780 E B F 11 A183490 325780