JCB — Slew Ram

Hydraulic Rams www.WorkshopManuals.co.uk Section E Hydraulics Section E 77 - 2 77 - 2 Removal and Replacement - Slew Ram Removal Inspection 1 Slew the backhoe to the left to remove the right hand slew ram and visa versa. Inspect the liner bearings 7 (located in the trunnion retaining bracket 3 ) and liner bearing 8 for signs of damage, wear, scores or nicks etc. Replace as required. 2 Lower the bucket to the ground and switch off the engine. To remove the liner bearing 8 use a jack located against blanking plate 9 . Shown in the inset at Y . ! WARNING Hydraulic fluid at system pressure can injure you.

Before disconnecting or connecting hydraulic hoses, stop the engine and operate the controls to release pressure trapped in the hoses. Make sure the engine cannot be started while the hoses are open. INT-3-1-11/1 To remove the bearing liner 7 from the trunnion bracket use flat faced bearing pullers. Replacement 3 Vent any residual hydraulic pressure by operating the backhoe and slew control levers. ! WARNING Fine jets of hydraulic fluid at high pressure can penetrate the skin. Do not use your fingers to check for hydraulic fluid leaks. Do not put your face close to suspected leaks. Hold a piece of cardboard close to suspected leaks and then inspect the cardboard for signs of hydraulic fluid.

If hydraulic fluid penetrates your skin, get medical help immediately. INT-3-1-10/1 4 Disconnect the hydraulic hoses 1 to the slew rams - before disconnecting the hoses make sure that they are labelled (to assist with reassembly). 5 Plug and cap all open hydraulic connections to prevent ingress of dirt and loss of hydraulic fluid. Replacement is generally a reversal of the removal procedures, however note the following: 6 Loosen and remove trunnion bracket retaining nuts 2 and hardened washers 2A (see note). Note: On assembly, the correct grade of nut (grade 12) and bolt (grade 10.9) must be used. Also, use hardened washers 2A - NOT ordinary washers.

Using incorrect specification items could result in a reduction of clamping efficiency. The liner bearings 7 and 8 have a ‘lead-in’ diameter (noticeable with a slight step), always install the smaller diameter first into the pivot bore. The bearings must be installed so that they sit flush. 7 Remove the trunnion bracket 3 . The eye end pivot pins 6 should be secured first - i.e. BEFORE the trunnion bracket retaining nuts 2 , this will help to maximise ram assembly alignment. ! CAUTION This component is heavy. Do not attempt to remove it unless its weight is held by a sling. Make sure that the sling is attached to a suitable lifting appliance.

Make sure that the hydraulic hoses are correctly installed. Make sure that any new or reused bearings are clean and smeared with grease prior to reassembly of pins and trunnion journals. HYD 2-3/1 8 Attach suitable lifting straps to the slew ram assembly. Note that the weight of the slew ram assembly is approximately 44 kg (97 lbs). When fully assembled, apply grease at each grease nipple BEFORE operating the machine. 9 Remove thin nuts 4 ( 2 off per pivot pin) and remove the pivot pin retaining bolt 5 . Use a 25 - 30 mm diameter bar to knock the pin out vertically.

Torque Setting Item Nm lb ft kgf m 2 650 480 66.3 10 Remove the slew ram (eye end) pivot pin 6 and swing the ram to clear the kingpost casting. 11 Lift the slew ram assembly clear of the machine. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1