www.WorkshopManuals.co.uk Section E Hydraulics Section E 85 - 3 Hydraulic Rams 85 - 3 Dismantling and Assembly: - Loader Lift Ram - Loader Shovel Ram - Boom Ram - Bucket Ram - Stabiliser Ram Assembly (continued) DRILLING DETAILS FOR PISTON HEAD RETENTION b Use an undersized diameter drill as a guide and drill into the piston rod to the required depth (see table), make sure the drill has centred correctly on the 'centre mark' made at step 5a. X c Use the correct size diameter drill to suit the dowel and drill to the required depth (see table). Y d Remove all swarf and contamination, insert the dowel. Position cylinder on bench and install rod assembly into cylinder.
A263750 Apply JCB Threadlocker and Sealer (High Strength) to first three threads of cylinder, torque tighten the end cap to 678 Nm (500 lbf ft). (all dimensions in mm) Ram Dowel Guide Guide Dowel Dowel Size Size Drill Ш Drill Drill Ш X Drill Depth Depth Y Note: If hydraulic oil contacts the uncured JCB Threadlocker and Sealer (High Strength) a weakening of the bond will result. Cure times vary according to the ambient temperature. Allow a minimum of 2 hours between assembly and filling the ram with oil. 80 x 50 6Ш x 20 4 21 6.02/6.10 22/23 70 x 40 Note: Cold weather operation.
When operating in conditions which are consistently below freezing, it is recommended that the rams are operated slowly to their full extent before commencing normal working. 90 x 50 8Ш x 25 5 24 8.02/8.10 27/28 100 x 60 110 x 60 12Ш x 30 8 28 12.02/12.10 32/33 110 x 65 Torque Settings 120 x 65 12Ш x 35 8 33 12.02/12.10 37/38 130 x 75 Item Nm kgf m lbf ft 7 405 41.3 300 1 678 69.2 500 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1