JCB — JCB Ram Sealing Procedure

www.WorkshopManuals.co.uk JCB Ram Sealing Procedure (continued) Fit new piston head seals: 6 Use a blunt instrument (892/01027) shown at F , lever the inner seal G into the piston head seal groove, do not let the seal twist. There are identification marks on the outer diameter of the seal, make sure the marks are visible and the seal is free to rotate, if not remove the seal and refit F 7 Fit outer seal H using the same procedure as step 6. Check the external grooves are visible. G 8 Ensure O ring is fitted into the internal seal groove on the piston head. Screw the piston head onto the thread of the piston rod, refer to the relevant section for torque figure and completion of ram assembly.

338470 9 Fit the piston head retaining dowel, see ram dismantling and assembling relevant section 10 Fit wear rings J and K . Rotate the wear rings so that the piston retention dowel is covered by the wear ring, NOT as shown at L . Fit the piston rod and head assembly into the cylinder: 11 Insert the piston/rod assembly into the cylinder. Align the rod and head assembly until parallel with the cylinder then push the assembly into the cylinder. H 12 Fit the end cap, refer to the relevant section for torque figure and completion of ram assembly. 338480 K J L 338490 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 89 - 2 89 - 2 Hydraulic Rams