JCB — Synchromesh (Blocking Pin Type)

www.WorkshopManuals.co.uk Syncro Shuttle Gearbox Synchromesh (Blocking Pin Type) The gearbox is fitted with 'Blocking Pin' synchromesh, comprising the following parts. As the speeds are synchronised the radial load on the blocker pin and the syncro hub is reduced. This allows the syncro hub to slide freely along the blocker pin and engage its dog teeth with second gear, see diagram J . SYNCRO HUB (A) controls the operation of the synchromesh unit and gear selection, the selector fork fitting into the outer groove. Internal dog teeth link the selected gear to the drive shaft.

Through the syncro hub centre are two sets of holes for the blocker pins ( C ) and the split energiser pins (D), spaced alternately. SYNCRO RINGS (B) are rigidly joined by the blocker pins, with the split energiser pins held, in counterbores, between the two syncro rings. BLOCKER PINS (C) have a narrow neck in the centre, against which the syncro hub transmits radial drive during gear changes. The edges of the blocker pin neck and their mating syncro hub holes are designed so that, as the radial loads are reduced, the syncro hub can slide over the shoulder of the blocker pin.

SPLIT ENERGISER PINS (D) take the initial axial load of the syncro hub on the shoulder of the split energiser pin neck. As the axial load reaches approximately 400 N (40.8 kg; 90 lb) the internal springs allow the split energiser pin to collapse and the syncro hub to move axially. SYNCRO CUPS (E) take the frictional drive from the syncro ring on their inner faces. The syncro cups are splined to drive their respective gears whilst synchronisation is taking place. SYNCHROMESH - OPERATION Diagram F shows the gearbox with first gear engaged. Syncro ring B is in contact with syncro cup E and the syncro hub dog teeth are linking first gear to the shaft gear.

In this position the split energiser pins D are 'collapsed'. When selecting second gear the syncro hub A slides along the split energiser pins until the pin recess and the syncro hub flange are in line. At this point the split energiser pins open and the syncro rings are moved by the syncro hub pushing on the split energiser pin shoulder. Initial contact between the syncro ring and the syncro cup starts to synchronise the speed of the shaft and second gear. The rotational force of the syncro ring is taken by the blocker pin against the edge of the syncro hub hole, as at G .

As the axial load on the syncro hub increases, the split energiser pin 'collapses' and the conical faces of the blocking pin and syncro hub hole come into contact, as at H . Further increases in the axial loads increase the frictional grip of the syncro ring and the syncro cup, causing the shaft and gear speeds to synchronise. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 25 - 2 25 - 2 Systems Description