JCB — Dismantling

www.WorkshopManuals.co.uk Hub and Driveshaft - Dismantling The following illustrations show the axle removed from the machine but the hubs may be dismantled without removing the axle. ! WARNING A raised and badly supported machine can fall on you. Position the machine on a firm, level surface before raising one end. Ensure the other end is securely chocked. Do not rely solely on the machine hydraulics or jacks to support the machine when working under it. Disconnect the battery, to prevent the engine being started while you are beneath the machine. GEN 1-1 1 Disconnect the steering track rod. Drain oil from the hub. Note: The illustration shows a typical axle. 2 Remove screws A .

3 Lever the planet gear carrier B off the bearing carrier. Clean off all traces of sealant from the mating faces or remove ‘O’ ring as applicable. B A S258220 4 Remove planet gears only if defective. Note that gears can only be removed as assemblies, which comprise the gear, the bearing and two 'L' shaped circlips. To remove a planet gear, first remove the external circlip. 5 Pull off the planet gear. 6 The driveshaft thrust pad C is drilled and tapped M6 for removal purposes. C 255920 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 81 - 1 Front Axle - SD55, SD70 81 - 1 Front Axle - SD55, SD70 81 - 1