JCB — Dismantling

www.WorkshopManuals.co.uk Dismantling (cont’d) 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 2* Section F Transmission Section F 125 - 6 125 - 6 Powershift Gearbox 7 Remove the Torque Converter Relief Valve a Undo the plug 7a and remove the sealing washer 7b, spring 7c and poppet 7d. Note that some gearboxes are fitted with a ball instead of a poppet. 8 Remove the Pressure Maintenance Valve a Undo the plug 8a, remove spring 8b and valve spool 8c. 9 Separate the Front and Rear Casings a Remove the 4WD clutch oil pipe 9a. b Undo the 17 casing bolts 9b. c Using suitable lifting equipment carefully lift off the front case 9c. Be sure to retrieve all the shaft bearing outer cups.

The cups may be left on the bearings, or inside the front case. Keep the cups with their associated bearings. d Remove and discard the 3 sealing ‘O’ rings 9e from the front case. Note: The 3 oil transfer pipes 9f, 9g and 9h located inside the front case need not be removed unless they are damaged, or the gearbox oil has been contaminated. If they are to be removed see Powershift Gearbox - Inspection. 4x4 Gearbox: pipe 9h not fitted. 10 Remove the Clutch/Shaft Assemblies a Carefully lift out the clutch/shaft assemblies in the following order:

10a - 6 speed clutch shaft (not fitted to 4x4 Gearbox) 10b - Reverse clutch unit 10c - Forward/Input clutch shaft 10d - Layshaft clutch 10e - Mainshaft clutch b Retrieve the bearing outer cups from the rear case 10f and centre of the transfer gear 10g. Note that the layshaft bearing cup 10h can not be removed until the transfer gear/output shaft has been removed, see step 11. Keep the cups together with their associated bearings. *