JCB — Assembly

www.WorkshopManuals.co.uk Assembly 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 127 - 2 127 - 2 Powershift Gearbox Using suitable lifting equipment locate the gearbox rear casing in a work cradle. Clamp the casing in position at the 3 clamping points as shown at A. DO NOT ATTEMPT TO ASSEMBLE THE GEARBOX UNLESS IT IS SAFELY LOCATED IN A SUITABLE WORK CRADLE. Where ‘oil’ is referred to, use new, clean transmission oil of the correct specification for the gearbox. See Section 3, Lubricants and Capacities. 1 Assemble the Transfer Gear/Output Shaft Note 1:

Before fitting the transfer gear/output shaft assembly 1d, fit the layshaft outer bearing cup to the casing (shown at E). Position the casing as shown at D. Note 2: The inner and outer taper roller bearing assembly (comprising double outer cup 1a, inner bearing 1c, spacer 1e and outer bearing 1f) is a matched set. Keep all the components together in their original relationships. Components from another set are not interchangeable. If any components are worn or damaged the whole assembly must be renewed as a complete matched set. a Make sure that you have fitted the layshaft outer bearing cup, see Note 1 above. Fit the bearing double outer cup 1a into the casing.

Note the correct way up of circlip 1b, with the chamfer uppermost. Make sure that the circlip locates fully in its groove as shown at B. The tangs of the circlip must not overhang the inner diameter of the bearing cup 1a. An incorrectly located circlip can foul and damage the outer bearing. b Push the inner bearing 1c onto the transfer gear/shaft 1d followed by spacer 1e. d Locate the transfer gear assembly in the casing from inside. Using service tool 892/01083 retain the gear in position (shown at C). If the gear is not held in position the bearings may be damaged during assembly. c Using service tool 892/01084 push on the outer bearing 1f.

Using service tool 892/01085 fit a new oil seal 1g. Make sure the seal is pushed square to the housing. e Fit yoke 1h followed by thick washer 1j and bolt 1k. Hold the yoke using service tool 892/00812 and torque tighten the bolt to 400 Nm (295 lbf ft). f If applicable fit the speed sensor 11f. Make sure that the sealing ‘O’ ring is correctly located and then torque tighten the bolt to 28Nm (20 lbf ft). 2 Checking Transfer Gear/Output Shaft Assembly End Float The transfer gear/output shaft and its associated components are manufactured using a ‘Setright’ system. Measure the rolling torque at the yoke 1h.

Provided components have been assembled correctly the torque will be between 0.6 and 2.2 Nm (0.5 and 1.6 lbf ft). E A395580 A A396090