JCB — Assembly

11 Fit the Solenoid Control Valve Block a Fit two guide studs at the valve interface on the front case. Locate a new valve block sealing gasket 11a as shown at C . Care is needed as the gasket is thin. Gearboxes fitted with a sub-base plate have two gaskets, one each side of the plate. b Fit the 8 socket head cap screws and washers 11b . The screws must be progressively torque tightened. Gradually tighten all the screws to 35 Nm (26 lbf ft). 12 Fit the Main Hydraulic Pump Driveshaft a Fit a new sealing ring 12a to the shaft 12b . Apply clean oil to the sealing ring and fit the shaft inside the gearbox. b Apply clean oil to the ball bearing 12c . Fit the bearing followed by circlip 12d .

13 Fit the Layshaft Cover a If applicable fit the layshaft cover 13a . Make sure the casing mating faces are clean and undamaged. Apply a thin bead of JCB Multigasket to the rear casing and fit the cover. Fit bolts 13b and progressively torque tighten to 56Nm (41 lbf ft). Note: The main machine hydraulic pump can be fitted at this stage. However, it is easier to fit the gearbox to the machine and then fit the pump. See Section E, Main Hydraulic Pump, Replacement. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section F Transmission Section F 127 - 14 127 - 14 Powershift Gearbox