JCB — Section B: Body and Framework

Contents Page No.

Service Tools 1 - 1 Slide Hammer Kit Procedure 1 - 4 Rivet Nut Tool Procedure 1 - 5 Technical Data Air Conditioning (Option) 2 - 1 Basic Operation Air Conditioning - R-134a Refrigerant 3 - 1 - System Operation 3 - 1 - System Control 3 - 3 - Safety Procedures 3 - 4 Fault Finding Air Conditioning - General Fault Indications 10 - 1 - System Diagnosis 10 - 3 - Wiring Continuity Checks 10 - 8 Service Procedures Air Conditioning - Leak Testing 20 - 1 - Tightening Leaking Hoses 20 - 1 - Checking Refrigerant Charge Level 20 - 1 - Refrigerant Charging and Discharging 20 - 2 - Binary Pressure Switch Testing 20 - 7 - Condenser Matrix Cleaning 20 - 8 - Filters - Changing and Cleaning 20 - 9 - Compressor Drive Belt - Adjusting 20 - 10 Glazing - Removing Broken Glass and Old Sealant 21 - 1 - Preparing and Installing New Glass 21 - 4 Cab ROPS/FOPS Structure - Checks 22 - 1 Engine Panels - Removing and Fitting 23 - 1 Stabiliser Leg - Wear Pad Adjustment 24 - 1 Extending Dipper - Wear Pad Adjustment 25 - 1 Sideshift - Hydraclamp Clearance Setting 26 - 1 Power Sideshift - Wear Pad Renewal 26 - 2 - Chain Adjustment 26 - 3 Air Conditioning HVAC*/Air Conditioning Unit - Removal and Replacement 30 - 1 Blower Unit - Removal and Replacement 30 - 3 Freeze Protection Thermostat - Removal and Replacement 30 - 3 Evaporator Matrix - Removal and Replacement 30 - 3 Binary Pressure Switch - Removal and Replacement 30 - 5 *HVAC = Heating, Ventilation and Air Conditioning 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section B Body & Framework Section B i i