JCB — Dismantling and Assembly

www.WorkshopManuals.co.uk Assembly (Continued) 7 Invert unit and place on a suitable hollow support so that body does not rest on protruding sleeve, thus preventing displacement of the new seals. Place ball 23 into check valve hole and fit bush 22 . 8 Fit new 'O' ring 10 . 9 Fit distributor plate 9 ensuring that holes align. Locate shaft 11 onto cross-pin 14 , noting position of slot. When rotor 7 is fitted, slot must align with hollows of rotor as shown at C . S229700 10 Use a suitable piece of rigid flat material, 0.25mm (0.010 in.) thick, to support the shaft and ensure positive engagement with the splines of rotor 7 . 11 Locate rotor onto shaft, ensuring alignment as at C .

Fit spacing bush 6 into rotor. 12 Fit 'O' rings 4 and 8 each side of body 5 , then position body over rotor. 13 Refit the end plate and fit at least one bolt 2 before removing support material. 14 Fit remaining bolts, ensuring that special bolt 1 is correctly located. Tighten all bolts to 29Nm (22 lbf ft). S229710 Pressure Relief Valve Cartridge After renewing the 'O' ring, torque tighten the cartridge to 50 Nm (37 lbf ft). The relief valve is preset, refer to Technical Data for the valve setting. The relief valve setting should be rechecked after fitting the steering unit to the machine. Refer to Service Procedures, Steer System - Pressure Testing .

Shock Valves If the shock valves have been dismantled, clean the threads of adjusting screw 31 and the threads in the bore of the steering unit body using JCB Cleaner/Degreaser, allow to dry. Assemble seat 35 , ball 34 , cap 33 and spring 32 then coat threads of screw 31 with JCB Threadlocker and Sealer. Assemble screw to depth measured during dismantling then fit plug 29 and washer 30 . 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section H Steering Section H 50 - 4 50 - 4 Hydraulic Steer Unit