JCB — Removal and Replacement

www.WorkshopManuals.co.uk Removal and Replacement Removal (continued) Replacement 25 If fitted, loosen and disconnect the ether cold start fuel line from the engine. Plug and cap open orifices to prevent ingress of dirt and loss of fluid. Replacement is a reversal of the removal procedure. 1 When mating the gearbox/torque converter to engine, ensure that the drive tangs are correctly located in the gearbox pump. See Section F Gearbox Replacement for a detailed procedure. 26 If fitted, loosen and remove the ether cold start canister retaining bolts, lift off the canister and retaining bracket assembly . 27 Disconnect the throttle linkage L from the arm on the fuel injection pump.

Leave at least one of the locking nuts in position, this will ensure that the engine revs are set correctly when reassembling. Note: It is vitally important that the torque converter is fitted at the gearbox and engine flywheel correctly. Failure to locate the converter correctly will result in damage to the gearbox oil pump on engine start up. 2 When you are satisfied that the torque converter is located correctly, use the access hole in the bottom of the gearbox to fit and tighten the flexi-plate to engine flywheel retaining bolts. Rotate the flywheel to align the next bolt hole, fit and tighten all retaining bolts. 28 Loosen and remove the rear propshaft to gearbox retaining bolts M .

29 On 4WD machines, loosen and remove the front propshaft to gearbox retaining bolts N . 30 Remove the access bung located at the base of the gearbox. Through the access hole, loosen and remove the torque converter to engine flywheel retaining bolts P (turn the flywheel to align bolts with access hole). 3 When fitting the radiator sub-assembly, including radiator, cooler and shroud take care not to damage the engine fan, align the shroud using alignment mark made at step 13 in Removal . 4 Make sure that the front nose guard and the engine cover are correctly aligned. 31 If manual gearbox fitted, disconnect the gearshift lever from the top of the gearbox.

5 Refill cooling system using correct mixture of water/anti-freeze. 32 Use a suitable trolley jack and support the weight of the gearbox. Note: Attach a ‘cradle’ to the trolley jack that will evenly support the weight of the gearbox. Refer to Service Tools . 6 Check engine, coolant and brake oil levels. 7 When connecting the battery, connect the earth (black) lead last. 33 Use a suitable stand and support the weight of the engine. Make sure that the engine idle speed is correct, adjust as required, refer to Technical Data . 34 Loosen and remove the gearbox mounting bolts Q .

Torque Figures 35 Remove the gearbox to engine retaining bolts R , pull the transmission and converter clear of the engine, make sure that the converter stays mounted on the gearbox shaft. Item Nm Kgf m lbf ft Description M 118 12 87 Rear propshaft bolts N 79 8 58 Front propshaft bolts P 44 4.5 32 Flexi-plate to flywheel bolts Q 237 24 175 Gearbox mounting bolts R 98 10 72 Gearbox to engine bolts S 85 8.7 63 Engine mounting bolts 36 Attach suitable lifting chains to the engine (see Lifting Wire Assembly, service tool 892/00836 in Service Tools ). Take the weight of the engine on the hoist. 37 Loosen and remove the engine mounting bolts S (both sides). Note :

The engine oil pressure switch, water temperature switch and water temperature sensor torque figure varies depending on the material it is screwed into. 38 Lift the engine clear of the machine. Nm Kgf m lbf ft Plastic 4 0.4 3.0 Aluminium 30 3.0 22 39 Put the engine on a suitable stand, the correct dismantling and assembly procedures are detailed in the Engine Service Manual, publication number 9806/0100. 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section K Engine Section K 30 - 3 30 - 3 Engine