12. OPERATION 3. Set the safety lock lever @ to the FREE position, and raise the bucket from the ground. AN113940 4. Operate bucket control lever @) and arm control lever 6) slowly to move the bucket cylinder and arm cylinder to the end of the stroke. Arm operation Bucket operation —Out nh, > grDdump Sf Curl =~ fA 5. Sa AN113950 Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 Left swing ON f . second intervals. If the swing lock switch © is set to the ON (actuated) position and swing control lever G) is operated at full stroke, oil temperaturerise can be increased earlier.
NOTICE When the work equipment is retracted, take care that it does AN113960 not interfere with the machine body or ground. 6. After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condition. Engine water temperature gauge (7): Fuel gauge ©): Inside green range Engine water temperature monitor @): Radiator water level monitor @: Engine oil pressure monitor @): Charge level monitor 43: Fuel level monitor @ range OUT OUT OUT OUT OUT Air cleaner clogging monitor @: OUT Engine OUT pre-heating Inside green monitor 45: Engine oil level monitor @: OUT ™ Hydraulic oil level monitor @: OUT Engine oil replacement monitor (8:
OUT 2-56 Check that there is no abnormal exhaust gas color, vibration. If any abnormality is found, repair it. noise, or 4D324290