23. MAINTENANCE SCHEDULE CHART 23. MAINTENANCE SERVICE ITEM SCHEDULE CHART PAGE Lubricating 3-49 e Arm 3-49 cylinder foot pin (1 point) e Boom-arm coupling pin (1 point) 3-50 e Arm cylinder rod end (1 point) 3-50 e Bucket cylinder foot pin (1 point) 3-50 e Arm-link coupling pin (1 point) 3-50 e Arm-bucket 3-50 coupling pin (1 point) e Link coupling pin (2 points) 3-50 e Bucket cylinder (1 point) 3-50 pin (1 point) 3-50 rod end e Bucket-link coupling Check oi!
level in swing machinery case, add oil 3-50 Drain water and sediment from fuel tank 3-51 EVERY 250 HOURS SERVICE Check oil level in final drive case, add oil 3-52 Check level of battery electrolyte 3-53 Change oil in engine oil pan, Lubricate swing Check fan belt tension, Check replace engine oil filter cartridge circle (2 points) 3-55 adjust | air conditioner compressor belt tension, 3-56 adjust EVERY 500 HOURS Replace fuel filter cartridge and Check swing Clean and pinion inspect grease Replace with air conditioner) air filters of air conditioner system (only for machines hydraulic tank breather element Replace hydraulic filter element oil in engine with 3-61 air conditioner) Change equipped 3-58 3-60 external with fuel filter cartridge (option) radiator fins, oil cooler fins and condenser fins Clean level, add SERVICE 3-59 equipped internal and additional 3-57 grease (only for machines equipped 3-54 oil pan, replace engine 3-61 3-62 oil filter cartridge (only for machine 3-54 optional filter cartridge) 3-23