TRANSPORTATION OPERATION When loading or unloading, always use ramps or a platform and carry out the operations as follows. 1. Properly apply the brakes on the trailer and insert blocks (2) beneath the tyres to ensure that it does not move. Then fix the ramps in line with the centers of the trailer and the machine. Be sure that the two sides are at the same level as one another. Make the angle of the ramps (3) a maximum of 15O. Set the distance between the ramps (A) to match the center of the tracks. AD052900A 2. Set the travel speed switch to the Lo position. Hi Mi Lo 0 0 0 AD1 57790 IA 3. Turn the auto-deceleration switch OFF, and return the fuel control dial to reduce the engine speed.
I I AD1 57780A 4. Turn the swing lock switch ON to apply the swing lock. 5. Set in the direction of the ramps, lower the work equipment as far as possible without letting it hit the trailer, then travel slowly to load or unload the machine. When on the ramps, do not operate any lever other than the travel lever. ON 6. Load the machine correctly in the specified position on the trailer. AM090290 REMARK When the work equipment is installed, load the machine from the front: when the work equipment is not installed, load the machine from the rear. 134