TROUBLESHOOTING OPERATION USING METHOD FOR LIGHT-WEIGHT TOWING HOLE A WARNING 0 The shackle must always be used. 0 Hold the rope level and direct it straight to the track frame. 0 Move the machine slowly in the Lo mode. The track frame has been equipped with a towing hole to pass the shackle through for towing light objects. In this case, the traction load must be 130 KN or less. PRECAUTIONS ON PARTICULAR JOBSITES 1. When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry out greas- ing every time the operation is carried out. 2.
For heavy-duty operations and deep digging, carry out greas- ing of the work equipment mounting pins every time before operation. After greasing, operate the boom, arm and bucket several times, then grease again. 144