. OPERATION TRANSPORTATION OPERATION TRANSPORTATION to 40 the hook posture arm, 3 - 187 5. Pass wire r opes between t he 1st and 2nd tr ack rollers front and b etween the 1st and 2nd tr ack ro llers from t However, f or machines eq uipped wit h a ful l roller gua track roller, pass the wire r ope unde r the tr ack. 6. Set the lifti ng angle (A) of the wire degrees, th en lift the mach ine slowly 7. After the machine comes off the groun condition a nd the lifting po sture, and then lift slowly. Machines With Lifting Hoo In the case of machines equip ped with a lifting hook, it is possible to lift the machine as foll 1. Remove cover (1) on the top surface of the counterweight.
The lifting hook is on the inside of cover (1). 1. Remove co ver (1) on the to p surface of the counterwei lifting hook is on the inside of cover 2. shown in t he diagram on the right. (Boo m fully rais bucket fully pulled in) set t he upper s tructu re facing s the front. ( 3. Set the loc k lever securely to the LOCK po sition. 4. Stop the en gine, check tha t the area arou nd the oper ator's cab is safe, t hen get down f rom the machine Close the c ab door, front g lass, left and rig ht doors, a nd engin e hood securely. rope. 5. Install shac kles to the liftin g hooks o n top of the boo m and counterweight, then fit wire