Komatsu — ATTACHMENT REMOVAL AND INSTALLATION

. ATTACHMENTS AND OPTIONS MACHINE READY FOR ATTACHMENT ATTACHMENTS AND OPTIONS MACHINE READY FOR ATTACHMENT right angles to long direction of arm) 6 - 16 6. one down, set the rotor of the stop valv e (installed to the pipin g for the outlet LOCK po port and inlet port on th sition (b). : Hydraulic oil flows (dire long direction of arm) : Hydraulic oil does not fl (b) LOCK When s etting the FREE or LOC K position of the stop v alve emove bolt (2), turn over p late (1), then turn the r otor. etting, install plate (1) aga 7. Remove t he hoses on the attachme nt side. Install the plug s to the 2 outl The plugs operation caused by mixing in of for eign matter.

After the p lugs are correc tly installed, store the att 8. Pull out th e mounting pins (2 place s), remove the attachment, then insta ll the bucket. ls of the procedure for installing the bucket, see REPLACEMENT AND INVERSION (PAGE lling the bucket, check the oil level in the hydraulic installing the bucket, see For detai see "BUCKET 3-169)". 9. After insta tank.