Komatsu — 12.16.3 INSPECTION AND REPAIR

OPERATION 12.16.2 INSPECTION AND ADJUSTMENT Properly adjust track tension. Tension should be measured at clearance shown in the diagram - usually 50 to 63 mm (2 to 2.5 in) at this point. For rocky terrain, tighten tracks slightly. In clay or sandy areas, slightly loosen them. For inspection and adjustment procedures, see 24.11.7 TRACKTENSION AND ADJUSTMENT on page 3-67. Check idler rollers for oil leakage as well as for loose bolts. If any trouble is detected, repair immediately. Check the clearance between the idler guide plate (1) and the track frame (2). If clearance A-A increases, the idler may develop side motion and the tracks may come off.

For inspection and adjustment procedures, see 24.11.7 TRACKTENSION AND ADJUSTMENT on page 3-67. 12.16.3 INSPECTION AND REPAIR Frequent inspection and prompt repair will reduce repair costs. The following items for inspection will serve as a guide to maintenance service of each undercarriage part. Perform periodical inspection and contact the distributor in your area when machine has ap- proached repairable limits and reversing limits. Measuring Link Pitch 1. Insert a wooden block between track shoe and sprocket to take up the slack in track shoes. 2-53