Assembly Procedure PC8000 27. Installation of Hose connections to the boom: Z22957; Z22958 1. Connect hoses (S) in between distributor manifold (91) and boom piping and tighten bolts to the required torque. 2. Install or connect hose connections to the boom boom cylinders stick cylinders bucket cylinders and boom to the stick and tighten to the required torque Pay attention the hose fitting to the rod side of the bucket cylinder are in an angle of 45° to vertical. ) Torques for flange connections refer to page 148. PC8000AS rev 02.doc 119 Edition 01/2004