Assembly Procedure PC8000 16. Install pins (5) and lock with catch (3+4). ) Do not forget the O – rings (15) refer to drawing 22962! 17. Extend clam cylinders to align them with borings in the clam. Install pins (1) and lock them with catch (2+3). 18. Connect all grease lines to the bucket and ensure that all grease points are greased before machine is put into operation. Connect line to the end of line switch. Refer to Service Manual “Lubrication Systems”, Section “Commissioning”. ) For further information about the tooth system refer to Service Bulletin AH03510. PC8000AS rev 02.doc 141 Edition 01/2004