Assembly Procedure PC8000 6. Mounting of Slew Ring underneath the Superstructure Platform: Z22922 Take the 8 slew ring bolts for determination of the tightening torque from the box and store them separately. (Identification of this bolts, Bolt head has a center bore). Weld the test block for determination of the tightening torque to a heavy steel plate (approx. 500 x 700 x 25 mm). Open the transport box for the slewring and lift them with the 4 attached eye bolts and the transport cross still in place, on a approx. 90 cm (3 feet) high wooden stack Place the slewring on the wooden stack that the S+SS marking points 90° to the left in travel direction.
The wooden stack should be placed not further then 2 meters away from the assembled undercarriage. Clean the contact surface on slewring to be absolutely grease free and dry. Attach lifting ropes as shown in the sketch on previous page. Lift superstructure platform by means of two cranes and clean contact surface to be absolutely grease free and dry. Swing platform over the slewring and lower until the two contact surfaces are still 5 - 6 mm apart, then support the platform with additional wooden stacks (do not rest the platform on slewring, and do not unhook from the cranes while working underneath). With the help of all mounting bolts pull up the slewring against the superstructure.
In case it is necessary to turn the swing gear pinion use a porto power pump for releasing the slew parking brakes. Do not apply more than 50 bar of pressure or this may destroy the seals in the brake cylinder. The hydraulic lines of all swing motors have to be opened. The backlashes at the swing gears are preadjusted at works by using the guides (Z22922). Proceed „Backlash Adjustment“ as specified in the service bulletin (AH00511a) if necessary. Check if the „S“ position of the inner and outer ring of the slew ring is correct. (Ref. Service Bulletin AH00511a). Turn the ring if necessary. ) Make sure that all bolts are mounted with spacers or hard surface washers.
Lubricate contact surface area on bolt head and thread with the factory delivered grease. Tighten all slewring bolts with the special determined torque. Refer to Service Bulletin AH00511a. Clean the surface of all teeth of the slew ring carefully and lubricate it by hand with the special grease for the slew ring lubrication system. Connect all grease lines. Install the dummy wheels. PC8000AS rev 02.doc 35 Edition 01/2004