Komatsu PC8000AS — PC8000AS rev 02

Assembly Procedure PC8000 7. Assembly of the Superstructure Platform onto the Undercarriage: Z22923 1. Lift the superstructure platform off the ground to clean the surface (contact area) of the slew ring. 2. Clean very carefully the contact surface for the slew ring in the center of the carbody. 3. Prepare all bolts (07 + 08) and thrust washers (02). Lubricate the threads as well as the head surface of the bolts with compound P/N 324 969 40. 4. On electric driven machines only Introduce high voltage cable. Pay attention alignment of the driving pins for the slip ring.

) For easy alignment install 2 guide pins ( 36 x 250, one end threaded M36 x 50mm other end pointed ~25mm) to the swing ring thread bores. One to the front and on to the rear. This simplifies the alignment of the slew ring to the undercarriage. 5. Align superstructure platform to the center carbody and lower it as required to insert 4 bolts. 6. Install one bolt at each 90° (for alignment) and lower superstructure platform so that there is a very little clearance between slew ring and center carbody. 7. Install all bolts and pre-tighten. Tighten the bolts cross-wise with the determined value (Refer to Service Bulletin AH00511a last edition). 8. Mount slewring protection. ) If appr.

10 bolts (front and rear) are tightened the superstructure platform can be unhooked from the cranes. PC8000AS rev 02.doc 37 Edition 01/2004