Komatsu PC8000AS — PC8000AS rev 02

Assembly Procedure PC8000 8. Assembly of the Prime Drive Unit to the Superstructure Platform: Z22925 / Z22926 1. Clean the contact surfaces of the superstructure and engine house from the anticorrosive paste with a appropriate solvent. 2. Prepare all bolts, washers and grease the threads and the washers as well as the head surface of the bolts. Use normal bearing grease. Don’t use special grease from swing ring connection. 5. Attach the unit to the crane (use only the attached lifting points (A). 6. Lower the unit as required so that two bolts with washers (02 + 03) for guiding can be inserted. 7. Lower the unit fully and insert all bolts with washers. Tighten the bolts with the resp.

torque. (This must be done directly because later-on it may be difficult to reach the bolts). 8. Remove the lifting brackets (A). PC8000AS rev 02.doc 43 Edition 01/2004