Assembly Procedure PC8000 14. Mounting of Operator’s Cab Z22938; Z22939 1. Apply sealing compound “ Epple 28” onto the whole contact surfaces (A) of the cab base. The sealing compound is delivered with the machine in a 1 liter can. 2. Lift the cab. Eyebolts are delivered with the machine. 3. Align the cab support frame (B) with the cab base contact surfaces (A). 4. Lower the cab support frame onto cab base. 5. Apply “Loctite 222” onto the thread of all mounting bolts (C) and fasten the cab support frame (B) with bolts (C) and resilient sleeves onto the cab base. Loctite 222 is delivered with the machine in a 250 ml tube. 6. Mount the handrails to the cab support frame 7.
Mount the hoses for the cab water heating. PC8000AS rev 02.doc 65 Edition 01/2004