Assembly Procedure PC8000 21. Installation of Lubrication Station and auxiliary Crane Z22947; Z22948 1. Lift the lubrication station in its position on the machine house deck and fasten it with the bolts and distance sleeves. 2. Lift auxiliary crane on top of machine and fasten with the bolts and distance sleeves as shown. 3. Tighten all bolts with the resp. torque, hook up all hydraulic and electric connections. PC8000AS rev 02.doc 91 Edition 01/2004