. INDEX INDEX 83 8 5 84 2 5 7 51 9 7 5 8 2 2 2 3 2 2 9 91 5 55 56 50 12 11 12 7 - 1 ACCUMULATOR, ADJUSTING POST URE OF WORK EQUIPMENT , HANDLING AIR CONDITIONER , HANDLING ASHTRAY EPA REG ULATION S, ENGINE N UMBER PLATE EXPLANATION OF COMPONENTS EXTERNA L POWER SOURCE T YPE ENGINE P REHEATI NG HEATE 3 - 1 - 3 - 3 - 159 3 - 66 3 - 56 3 - FOREWO FRONT P FRONT/REAR, LEF T/RIGHT DIRECTIO NS OF M FUSE BO BLADE SERIAL NO .
PLATE POSITION BREAKING IN THE 1 - 3 - 1 - 1 - 1 - 3 - CAP WITH LOCK, METHOD OF OP ENING AND CLOSING CAP CAR STEREO, HA CHECK AFTER FIN ISHING WORK CHECK AFTER ST OPPING ENGINE CHECK BEFORE S TARTING ENGINE, ADJUS COLD WEATHER OPERATION AFTER COLD W AFTER COMPLE TION OF WORK PRECAUTIONS TEMPERATURE CONTROL LEVER 6 - GENERAL PRECAUTIONS GENERAL PRECAUTIONS PRECAUTIONS R ELATED TO SAFET GENERAL GENERAL VIEW OF CONTROL S AND GAUGES GENERAL VIEW OF GUIDES T O MAINTENANCE 6 - 5 57 5 3 - 57 3 - 144 3 - 125 2 - 6 - 6 - 3 - 3 - 93 3 - 174 3 - 176 3 - 176 3 - 3 - 4 - 3 - 174 3 - 41 HANDLIN G HYDRA ULIC RELATED EQUIPME HANDLIN G MACHI NES EQUIPPED WITH VH HANDLIN G OIL, FU EL, COOLANT, AND PERFORMING OIL CLINIC 4 - DOOR OPEN LOC DOOR POCKET DUST I NDICATOR 3 - 3 - 3 - 3 - 4 - EFFECTIVE METH OD OF OPERATION FOR DUAL TILT D BLADE CONDIT BOULDER RAIS ING OPERATION DITCHING OPE DOZING WORK OZING ROM SIDE SLOPE ND) EADING) HORIZONTAL D OPERATIONS F ROM SIDE SLOPE (ROUGH GROU LEVELING (SPR OPERATION OPERATIONS F MODE EM SIDE-CUTTING OPERATIONS EFFECTIVE USE O SELECTION SYST INSTALLATION OF INTRODUCTION 3 - 172 1 - 7 6 - 6 - 6 - 6 - 6 - 6 6 11 11 8 LOADING , UNLOAD ING WORK LOCKING LONG-TE RM STOR AFTER STORAG BEFOR E STORA DURIN G STORA STARTI NG MAC HINE AFTER LONG-TERM ST ORAGE 3 - 164 3 - 144 3 - 177 3 - 177 3 - 177 3 - 177 6 - 6 - 6 - 3 - 177 3 - 147