Doosan DL06 — Doosan DL06 User Manual

(1) Lubricating system z Before reassembling the turbocharger onto the engine, inject new oil in the oil inlet port and lubricate the journal and thrust bearings by rotating them with hand. z Clean not only the pipes installed between the engine and oil inlet port but also the oil outlet pipe and check them for damage or foreign matters. z Assemble each joint on oil pipes securely to prevent oil leaks. (2) Air intake system z Check the inside of the intake system for foreign matters. z Assemble each joint on the intake duct and air cleaner securely to prevent air leaks. (3) Exhaust system z Check the inside of the exhaust system for foreign matters.

z Be sure to use heat resisting steel bolts and nuts. Do not interchange them with ordinary steel bolts and nuts when performing reassembly operation. Apply anti-seizure coating to the bolts and nuts. z Assemble each joint on the exhaust pipes securely to prevent gas leaks. DL06 Diesel Engine Maintenance of Major Components 183