OPERATION 3.2 CONSTRUCTION OF THE SHOVEL Engine Oil Management System (Special Equipment) The engine oil management system combines the automatic engine oil supply system “Reserve” and the oil burning system “Centinel” in connection with the “Eliminator” oil filtration sys- tem. Reserve System Oil Flow Schematic, illust. Z 23083 (3) Oil filters for the engine oil reserve system (4) Suction line from reserve tank (5) Suction line to pumping unit (6) Supply line from pumping unit to crankcase (7) Withdrawal oil line from engine oil pan to pump (8) Ventilation line for reserve tank (11) Oil feed-back line to reserve tank (12) Pumping unit, located on the cross member below the fire wall.
The pump unit works automatically as soon as the engine speed is above 300 RPM. The pump unit consists of a pumping element for feeding oil from tank (13) into the engine oil pan. The second pumping element withdraws oil from the engine oil pan and feeds it back into the reserve tank when the oil level in the oil pan exceeds the maximum running oil level. The combined oper- ation of the pumping elements maintains an optimal oil level in the engine oil pan. Oil drawn off by the Centinel burn system is also replaced through the supply system “Reserve”. (13) Reserve oil tank. The reserve oil tank is an integrated part of the main frame cross member.
(14) Drain plug (15) Cross member below the fire wall (16) Plug (on shovels with KIM Hot start heating system a thermostat is installed in place of the plug). (17) Oil level sight gauge (18) Refilling line from swing down service arm 65