Kaiyi HA30 — 5-ha30

HYDRAULIC SYSTEM Ch 5 page 60 Accumulators Description of the Accumulators The 2,15 Liter parking brake accumulator is placed on a bracket The UCA assembly is screwed onto the accumulator’s gas Figure 54 Hyundai recommends that the pre-charge should be checked during the first week following commissioning of the system. Thereafter, it should be checked every three months, or at intervals determined by the system builder.

The Effect of Temperature on Pre-charge Pressure In order to compensate for the difference in pressure at ambient and operating temperatures, it is recommended that the pre-charge pressure po should be adjusted to reflect the operating temperature of the system, using the correction factor equations and table on page 65. Warning – Stabilization The process of charging or discharging an accumulator with nitrogen causes a temperature change which is transmitted to the surrounding air as the temperature of the accumulator stabilizes.

To allow for the effects of temperature transfer, the accumulator should be allowed to stand for a minimum of 15 minutes before a final reading of the pre-charge pressure is taken. SHOP MANUAL on the RHS of the front frame along with the 3,3 Liter service brake accumulator, and the 3,3 Liter rear service brake accumula­ tor, the 2x 4.0 Liter self centering accumulators are placed on both sides of the front frame, behind the sucpension cylinder. The accumulators are from Hyundai factory loaded with Nitrogen (N ) 2 NOTE Pre-charge Wet disc brake: Pressure: 60 bar Park brake: Pressure: 112,5 bar: ACC. self centering: Pressure 23 bar (HA30) Acc. self centering:

Pressure 25 bar (HA45) Read the loading instruction marked on each of the accumulators. Checking and Adjusting Pre-charge Pressure The pre-charge pressure of the accumulator may be checked, and nitrogen filled or vented, using the UCA Universal Charging & Gauging kit. (See view of the kit at next page) Accumulator 2,15 litre Right hand side. Park brake. Accumulator 3,3 litre right hand side. Rear service park brake. Accumulator 3,3 litre right hand side. Front service park brake. 2x accumulator 4,0 liter for self leveling. Precharged with 23 bar. valve, allowing the pre-charge pressure to be checked or reduced.

If the pre-charge pressure is to be increased, the UCA can be On new models connected to the nitrogen source with the hose supplied. The UCA Accumulator test points kit is supplied with two pressure gauges, reading 0-25 bar and are located on the test 0-250 bar; where a different pressure range is required, a block. Commercially-available pressure gauge may be used. A TMPR ACC3 PS ACC2 LSOM ACC1 FDM B LSP1M P1M (145) (141) (144) (143) (142) (140) Safety Charging must be carried out by qualified personnel. Before taking any readings or pressurizing with nitrogen, the accumulator must be isolated from the hydraulic system and the fluid side discharged in order to depressurize it.

Use only nitrogen (N2) to pressurize the accumulator. Figure 55 DANGER On new models Accumulator test points are located on the test block. A TMPR ACC3 PS ACC2 LSOM ACC1 FDM B LSP1M P1M (145) (141) (144) (143) (142) (140) DANGER The types of nitrogen permitted are: type S (99.8% pure); type R (99.99% pure); type U (99.993% pure). If the pressure of the gas contained in the nitrogen bottle is greater than the maximum permissible operating