Komatsu — 4.7.1.f CHECKING THE SHOE FASTENING

MAINTENANCE PLAN 4.7.1.f CHECKING THE SHOE FASTENING DANGER To make up for the inevitable settling movements, it is absolutely necessary to check the driving torque of the screws (1) after the first 30 hours of operation. A successive check must be carried out after the first 100 hours of running-in and repeated after 200 hours of operation if a considerable decrease in the screw fastening is observed. If the screws (1) loosen and the driving torque is not corrected, the duration of the tracks will certainly be shorter. After tightening the screws, make sure that nut and shoe are in contact with the surface of the link. The check must be carried out with the machine at rest on level ground.

1 Tightening method Tighten the screws with an initial driving torque of 20±2 kgm, making sure that nut and shoe are in contact with the link surface. Successively give a further turn of 120°±10°. Use a 24 mm spanner. 1 RWAA1570 Tightening sequence The screw tightening sequence for each element must respect the order 1-2-3-4 indicated in the figure. RWA19800 152 4 1 2 3