MAINTENANCE PLAN 4.7.11.j CHECKING THE BALL-BEARING RING PINION LUBRICANT LEVEL 2 1 4 3 100 mm RYA15880 4 RWA19350 176 IMPORTANT • Carry out this check with the machine at rest and at the end of work, that is, with the machine at operating temperature. This check is visual and serves to verify the level of the grease contained in the tank (1) that encloses the pinion (2) and the ball- bearing ring (3). Remove the cover (4) from the upper structure and check the level with a graduated ruler; the grease level must reach half the height of the ball-bearing ring teeth (approx. 100 mm). Use a 17 mm spanner.
During this check, it is advisable to make sure that the grease is clean and to change it if any impurities are observed inside it. (See “4.7.13.e CHANGING THE BALL-BEARING RING PINION LUBRICANT”). DANGER RYA15890 RYA15890 • Retract the bucket and arm cylinder completely, extend the cylinders of the two-piece boom completely, lower the bucket teeth to the ground and, after stopping the engine, release the residual pressures from the work equipment circuits (by operating the controls more than once) and from the tank (by slowly loosening the filling cap). • Let the oil cool down until it reaches 40-45°C before carry- ing out any maintenance operation.
• Immediately clean any area dirty with oil. 1 - Rotate the upper structure by 90°, in such a way as to leave the lower part of the hydraulic oil tank free from the tracks. 2 - Retract the bucket and arm cylinder completely, extend the cylinders of the two-piece boom completely, lower the boom until the bucket teeth touch the ground. 3 - Lower the blade to the ground. 4 - Stop the engine and release the residual pressures from the equipment circuits by shifting the controls more than once. RYA15900 RYA15900