. OPERATION OPERATION OPERATION OPERATION that to raise the the F (forward) or R 3 - 76 2. Operate position and check speed r ange displa y lamp ( 3) shows the correct position. 3. Set the work equip ment loc k lever (6 ) to the FREE position 4. Put bla RAISE blade 4 0 to 50 cm ( 16 to 20 in) off the ground. 5. Move jo move th e machine (reverse) position 6. Pull fue l control lev er (7) to increase engine speed