ce t — CX130/CX160

ELECTRICAL POWER BOOST Circuit Configuration 1. Power boost switch 2. Main Controller 3. Power boost solenoid valve 4. Travel pilot pressure switch 5. Main relief valve Pressure increase in each work mode 4 - 27 CX EXCAVATORS CX130/CX160 H MODE 4970 → 5260 psi (8 seconds) S MODE L MODE 4970 → 5260 (constant) AUTO MODE 4970 → 5260 (8 seconds)